LeeB
Senior Member
- Joined
- 2012
- Posts
- 105
- Geo
- OZ
So for some reason my second shift person set the stacker to lower every time a job finishes. How the hell do I shut this off? It is driving me crazy. I run two machines and cant run over to the stacker every time a job is done.
I gang a bunch of jobs up to maximize production and this is KILLING ME!
I gang a bunch of jobs up to maximize production and this is KILLING ME!