Sample a VI job

Stiv

Senior Member
Joined
2010
Posts
292
Geo
Michigan, USA
So I have a 100,000 variable data job and I need to sample every 500th record.

Since I am only printing 1, I can't just set it to sample every 1000.

I am selecting sample manually right now. There has to be a way to program it.
 
Stiv
We use XMPie with all of our variable projects we divide the into batches of 500 sheets. This works best for us in many ways. 500 Sheet lifts fit in the cutter. If the cutter operator miss cuts on batch we just down load that batch a reprint. 500 Sheet batches are easy to put up from the stacker. Etc.
Hope this will help.
Jim:cool:
 
  • Forum posts represent the experience, opinion, and view of individual users. The Color Printing Forum does not necessarily endorse nor share the view of each individual post. When making any potentially dangerous or financial decision, always employ and consult appropriate professionals. Your circumstances or experience may be different.
    Back
    Top