I have just now loaded my Komori L440. It seems that the machine is not on zero level and probably should have slightly immersed because I have recently levelled the ground due to it being uneven and not at zero level. Probably because of the new levelling foundation. So Komori was then adjusted with the bolt at its legs and made to zero level. Now for the past 2 days nothing has happened and it's still at zero level. Is there any chance of a risk the machine may get further immersed down as time passes by due to vibration at high speed ?
(Info : Foundation starts with 20 Feet Clay and on the top of the clay is 4 Feet of Rubbish gained from breaking Brick Walls and at last on the top, 5 Inches of hard concrete)
(Info : Foundation starts with 20 Feet Clay and on the top of the clay is 4 Feet of Rubbish gained from breaking Brick Walls and at last on the top, 5 Inches of hard concrete)