igen down for 2 days !!!!!!!

Discussion in 'Xerox iGen3, iGen4, & iGen5 Digital Presses' started by Swifty2, Jul 11, 2013.

  1. Swifty2

    Swifty2 Senior Member

    Joined:
    Mar 2013
    Messages:
    300
    Location:
    Ma.
    original call was for a shorted out duplex motor....it shorted out and took out a couple of boards in the back...tech started fixing this machine at noon(call was placed at 830am) on weds.....worked till 530pm ..had some parts shipped over nite and is back today ...still not pushing paper:mad::mad::mad:...good thing we are a little slow this time of year....We only have 40 and counting jobs backed up:p:mad:
     
  2. terrymcv

    terrymcv Senior Member

    Joined:
    Nov 2009
    Messages:
    223
    Location:
    Florida USA
    Xerox IGEN3 and Fiery Digital front end
    2006 Xerox IGEN3 and Fiery Digital front end



    Impression Counts:
    Color= 15,044,600
    Black=1,765,000
    Large Prints Color 14,511,800
    Extra Large Prints color 36,600

    located CA. USA

    Installation, training available

    Shipping worldwide

    $15,000 Yes only $15,000 takes it


    Also I have a igen 4 for sale

    Terry Mc Vittie
    813-949-7397 Ph.
    813-398-5141
    terrymcv@gmail.com
    www.equipment-exchange.net
     
  3. Swifty2

    Swifty2 Senior Member

    Joined:
    Mar 2013
    Messages:
    300
    Location:
    Ma.
    damn Igen still down.... another part over nited to us this morning...******* wrong part in the box!!! I knew it when I seen it was a xerox return tag on the box. Oh the joy of running one side at a time :(
     
  4. LeeB

    LeeB Senior Member

    Joined:
    Jul 2012
    Messages:
    105
    Location:
    OZ
    What is the reaction from the Higher Ups like when you are down for that long? Are they understanding or is it "The sky is falling" mentality?
     
  5. peels

    peels tree killer :)

    Joined:
    Dec 2010
    Messages:
    1,113
    Location:
    southeast iowa, usa

    I have been there more times than I care to admit.

    It WAS useful once, though... ON a 15,000 sheet job:

    art approved, then data had problem, so had to wait...side one variable personalized. side two, static art only. I saved myself working the weekend by running backs first.

    got lots of weird looks when I got the job done two days early LOL

    Ive found that its not much slower-unless a thick card stock you have to stop and unload alot....
     

  6. Swifty2

    Swifty2 Senior Member

    Joined:
    Mar 2013
    Messages:
    300
    Location:
    Ma.
    Back up and running with the right part installed at 9am today !!!!On friday we had to run variable data job one side at a time...pain in the *** finding the name in the file when the Igen jams.
    We are a small shop..4 full timers. The boss/owner,boss wife, me (bosses brother) and one other slave. We take it in stride and use it as ammo when it is time to re-negotiate the lease......
     